2018 - 2019
job
Senior Project Planner
Insite Technical.
As Senior Project Planner I worked directly with the projects and commercial
teams to develop client-facing contract programmes including schedules for work on a future plant turnaround with one of our local clients. Daily duties included
updating the Detailed Design Schedule alongside Project Managers to ensure a
robust and achievable schedule is delivered which accurately reflects risks and key
project milestone opportunities. Also, for generating earned value analysis
schedule reports and resource requirement histograms and project progress/delay
s-curves.
teams to develop client-facing contract programmes including schedules for work on a future plant turnaround with one of our local clients. Daily duties included
updating the Detailed Design Schedule alongside Project Managers to ensure a
robust and achievable schedule is delivered which accurately reflects risks and key
project milestone opportunities. Also, for generating earned value analysis
schedule reports and resource requirement histograms and project progress/delay
s-curves.
Design, Turnaround
2015 - 2017
job
Senior Project Planner
Tidal Lagoon Swansea Bay.
Tidal Lagoon Swansea Bay is the world's first, man-made, energy-generating
lagoon with a 320MW installed capacity. My role here is to produce a master
Programme including:
• Producing a schedule and tracking progress on Governmental and local
authority planning consents.
• Capturing real estate and crown consent acquisitions and permissions.
• Tracking financial applications through the project.
• Integrating tier one contractor schedules to produce a baseline master
programme for the construction phase of the project.
• Developing employer's requirements for progress reporting throughout the project.
• Planning an O&M programme for the project operational phase.
lagoon with a 320MW installed capacity. My role here is to produce a master
Programme including:
• Producing a schedule and tracking progress on Governmental and local
authority planning consents.
• Capturing real estate and crown consent acquisitions and permissions.
• Tracking financial applications through the project.
• Integrating tier one contractor schedules to produce a baseline master
programme for the construction phase of the project.
• Developing employer's requirements for progress reporting throughout the project.
• Planning an O&M programme for the project operational phase.
Energy, Energy
2010 - 2015
job
Senior Project Planner and Engineering support
Amec UK, Hook LNG.
Amec UK South Hook LNG Terminal Milford Haven. Using Primavera P6. My
prime responsibilities and duties were to:
• Ensure project delivery strategies are systematically and routinely analyzed.
• Develop project specific schedules and revise strategies with PM and Client as
required.
• Develop and monitor KPIs to improve project delivery.
• Prepare, control and revise project specific schedules
• Liaise regularly with construction execution team to ensure effectiveness of the schedule.
• Ensure reviews are performed on the schedules when change control is
enacted.
• Monitor and record time booking against project deliverables.
• Liaise with sub-contract leads on progress and manning levels.
• Support the construction Manager and HSE Engineer in the weekly progress
meetings.
• Provide Engineering support on the production and close out of MoC, HAZOP,
and HAZID actions documentation.
• Manage drawings and documentation to and from the SharePoint database for
the construction management team.
• Initiate and maintain Management of Change documentation.
• Head up Route cause Analyses using Reality Charting Software.
• Produce cost estimates for potential projects and repairs.
prime responsibilities and duties were to:
• Ensure project delivery strategies are systematically and routinely analyzed.
• Develop project specific schedules and revise strategies with PM and Client as
required.
• Develop and monitor KPIs to improve project delivery.
• Prepare, control and revise project specific schedules
• Liaise regularly with construction execution team to ensure effectiveness of the schedule.
• Ensure reviews are performed on the schedules when change control is
enacted.
• Monitor and record time booking against project deliverables.
• Liaise with sub-contract leads on progress and manning levels.
• Support the construction Manager and HSE Engineer in the weekly progress
meetings.
• Provide Engineering support on the production and close out of MoC, HAZOP,
and HAZID actions documentation.
• Manage drawings and documentation to and from the SharePoint database for
the construction management team.
• Initiate and maintain Management of Change documentation.
• Head up Route cause Analyses using Reality Charting Software.
• Produce cost estimates for potential projects and repairs.
SharePoint, Database, Management, Engineering, Support, Primavera, Software, Production, Booking, Manager, UP
2008 - 2010
job
Projects Planner
Murco Petroleum Limited, Milford Haven Oil Refinery.
Murco Oil Refinery Milford Haven as a Capital Projects and Shutdown Planner.
In 2010 completed Murco 2010 T&I. This was the largest ever undertaken on
this refinery. Planning software included Primavera Suretrak, P3, SAP, Microsoft
Access and Microsoft Excel.
In 2010 completed Murco 2010 T&I. This was the largest ever undertaken on
this refinery. Planning software included Primavera Suretrak, P3, SAP, Microsoft
Access and Microsoft Excel.
Excel, SAP, Primavera, Software
2007 - 2008
job
Planner
Shaw Group Inc, South Hook LNG.
South Hook LNG. Working with the senior planner I was responsible for
updating the piping and mechanical plans in Primavera P3 and producing
weekly work plans using Microsoft Access and Microsoft Excel taking the senior planning position for the last four months to completion of the contract.
• Liaising with Shaw site engineers to product weekly progress reports and update the S curves for the client CB&I Co.
• Updating the Access database with progress, material and pipe support
availability extracting information from Data Ease database.
• Producing and tracking a balance of plant piping testing plan to completion of contract.
updating the piping and mechanical plans in Primavera P3 and producing
weekly work plans using Microsoft Access and Microsoft Excel taking the senior planning position for the last four months to completion of the contract.
• Liaising with Shaw site engineers to product weekly progress reports and update the S curves for the client CB&I Co.
• Updating the Access database with progress, material and pipe support
availability extracting information from Data Ease database.
• Producing and tracking a balance of plant piping testing plan to completion of contract.
Excel, Database, Support, Primavera, Testing
2004 - 2007
job
Maintenance Planner
Jenkins and Davies Ltd, Chevron Ltd, Pembroke Plant.
After planning a shutdown on Total Oil Refinery Milford Haven using Microsoft
Project software, I assumed the role of planner in Blending and Shipping for
Jenkins and Davies a local engineering company.
• Working closely with Chevron management my role was to provide planning
and create library plans (using Orbit software) for the maintenance contract on
Pembroke Plant, this included replacing large and small bore pipe work from the jetty to the tank farms, refurbishment of propane spheres and oil tanks.
• Planning the replacement of sections of the jetty was a challenging side to this
job, coordinating large barge lifts with the tides and the constant flow of shipping in and out of Chevron Refinery.
Project software, I assumed the role of planner in Blending and Shipping for
Jenkins and Davies a local engineering company.
• Working closely with Chevron management my role was to provide planning
and create library plans (using Orbit software) for the maintenance contract on
Pembroke Plant, this included replacing large and small bore pipe work from the jetty to the tank farms, refurbishment of propane spheres and oil tanks.
• Planning the replacement of sections of the jetty was a challenging side to this
job, coordinating large barge lifts with the tides and the constant flow of shipping in and out of Chevron Refinery.
Jenkins, Management, Engineering, Shipping, Software
My education
Pembroke Comprehensive School Pembroke
N/a, English Language CSE
N/a, English Language CSE
Meurig's reviews
Meurig has not received any reviews on Worksome.
Contact Meurig Davies P H O T O G R A P H Y
Worksome removes the expensive intermediaries and gives you direct contact with relevant talent.
Create a login and get the opportunity to write to Meurig directly in Worksome.
38100+ qualified freelancers
are ready to help you
Tell us what you need help with
and get specific bids from skilled talent in Denmark