$$$$
{{ $t($store.state.user.experience_value_in_dollars) }}
Expert
{{ $t($store.state.user.experience_search_name) }}
0
jobs
Structural CAD & RC Detailer
Clive Monk
,
Poole, United Kingdom
Experience
Other titles
Skills
I'm offering
Freelance Structural CAD Technician & RC Detailer
Markets
United Kingdom
France
Germany
Denmark
Norway
Sweden
Finland
Links for more
Once you have created a company account and a job, you can access the profiles links.
Industries
Language
English
Fluently
Ready for
Larger project
Ongoing relation / part-time
Full time contractor
Available
My experience
2019 - ?
temp
Contract RC Detailer/Revit Technician
Derrick Wade Waters.
Short term contract, updating Revit model from Tender stage to construction of a RC Frame residential project and RC detailing all the elements.
Revit
2019 - ?
temp
Contract RC Detailer/Revit Technician
Derrick Wade Waters.
Short term contract, updating Revit model from Tender stage to construction of a RC Frame residential project and RC detailing all the elements.
Revit
2019 - 2019
temp
Contract RC Detailer
One Creative Environments Ltd.
RC detailing on various projects including Yeovil Hospital Residential,
Hereford Medical centre & HCA UHB Specialist Hospital Facility
Birmingham.
Hereford Medical centre & HCA UHB Specialist Hospital Facility
Birmingham.
2019 - 2019
temp
Contract RC Detailer
One Creative Environments Ltd.
RC detailing on various projects including Yeovil Hospital Residential,
Hereford Medical centre & HCA UHB Specialist Hospital Facility
Birmingham.
Hereford Medical centre & HCA UHB Specialist Hospital Facility
Birmingham.
2017 - 2019
job
Senior CAD/REVIT Technician
Reuby & Stagg.
Design & Draughting of foundations for housing developments and RC
detailing of ground beams and retaining walls associated to these projects.
detailing of ground beams and retaining walls associated to these projects.
Design, Revit, CAD
2017 - 2019
job
Senior CAD/REVIT Technician
Reuby & Stagg.
Design & Draughting of foundations for housing developments and RC
detailing of ground beams and retaining walls associated to these projects.
detailing of ground beams and retaining walls associated to these projects.
Design, Revit, CAD
2015 - 2018
job
A confident, organised, team worker
PERSONNAL STATEMENT.
with good attention to detail who has the ability to work under own
steam using initiative improve efficiency able to hit the ground running on projects. Excellent IT skills
particularly AutoCAD (in which I have used all versions from R10 to 2020) I am also proficient with Revit 2015 - 2018 as well as a confident user of CADS RC, multisuite, Excel, Access, Word, Outlook and Powerpoint. Good transferable skills from being a structural CAD technician, including
administrative duties, document control and management. I have excellent written and oral
communication skills.
EXPERIENCE RECORD
steam using initiative improve efficiency able to hit the ground running on projects. Excellent IT skills
particularly AutoCAD (in which I have used all versions from R10 to 2020) I am also proficient with Revit 2015 - 2018 as well as a confident user of CADS RC, multisuite, Excel, Access, Word, Outlook and Powerpoint. Good transferable skills from being a structural CAD technician, including
administrative duties, document control and management. I have excellent written and oral
communication skills.
EXPERIENCE RECORD
Excel, Powerpoint, Autocad, Revit, CAD, Word, Management, It, Team worker, Detail, Autocad
2015 - 2018
job
A confident, organised, team worker
PERSONNAL STATEMENT.
with good attention to detail who has the ability to work under own
steam using initiative improve efficiency able to hit the ground running on projects. Excellent IT skills
particularly AutoCAD (in which I have used all versions from R10 to 2020) I am also proficient with Revit 2015 - 2018 as well as a confident user of CADS RC, multisuite, Excel, Access, Word, Outlook and Powerpoint. Good transferable skills from being a structural CAD technician, including
administrative duties, document control and management. I have excellent written and oral
communication skills.
EXPERIENCE RECORD
steam using initiative improve efficiency able to hit the ground running on projects. Excellent IT skills
particularly AutoCAD (in which I have used all versions from R10 to 2020) I am also proficient with Revit 2015 - 2018 as well as a confident user of CADS RC, multisuite, Excel, Access, Word, Outlook and Powerpoint. Good transferable skills from being a structural CAD technician, including
administrative duties, document control and management. I have excellent written and oral
communication skills.
EXPERIENCE RECORD
Excel, Powerpoint, Autocad, Revit, CAD, Word, Management, It, Team worker, Detail, Autocad
2017 - 2017
job
Methology Draughtsman
Centre in London.
Construction of a Proton Beam Therapy (PBT) Centre in London. Bouygues
UK has been awarded the design and built of the University College Hospital
Phase 4 which consists in a 6 storeys above ground building, and 5 storeys below ground. The substructure includes the PBT area, which consists in very
thick concrete structures, including multitude of embeds, making its
construction as challenging as a nuclear plant.
UK has been awarded the design and built of the University College Hospital
Phase 4 which consists in a 6 storeys above ground building, and 5 storeys below ground. The substructure includes the PBT area, which consists in very
thick concrete structures, including multitude of embeds, making its
construction as challenging as a nuclear plant.
Design
2017 - 2017
job
Methology Draughtsman
Centre in London.
Construction of a Proton Beam Therapy (PBT) Centre in London. Bouygues
UK has been awarded the design and built of the University College Hospital
Phase 4 which consists in a 6 storeys above ground building, and 5 storeys below ground. The substructure includes the PBT area, which consists in very
thick concrete structures, including multitude of embeds, making its
construction as challenging as a nuclear plant.
UK has been awarded the design and built of the University College Hospital
Phase 4 which consists in a 6 storeys above ground building, and 5 storeys below ground. The substructure includes the PBT area, which consists in very
thick concrete structures, including multitude of embeds, making its
construction as challenging as a nuclear plant.
Design
2015 - 2017
job
Senior CAD/REVIT Technician
RC frame and Steel Frame construction.
During my time with Calcinotto I have been producing construction drawings on varies small projects of RC frame and Steel Frame construction. These
projects have been modelled using Revit and any required RC detailing for
these projects using CADS RC
crm/1
projects have been modelled using Revit and any required RC detailing for
these projects using CADS RC
crm/1
CRM, Revit, CAD
2015 - 2017
job
Senior CAD/REVIT Technician
RC frame and Steel Frame construction.
During my time with Calcinotto I have been producing construction drawings on varies small projects of RC frame and Steel Frame construction. These
projects have been modelled using Revit and any required RC detailing for
these projects using CADS RC
crm/1
projects have been modelled using Revit and any required RC detailing for
these projects using CADS RC
crm/1
CRM, Revit, CAD
2014 - 2015
job
CAD Manager
Hochtief/Murphy Joint Venture.
(Thames Tideway Tunnel Tender & York Potash Material Handling Tunnels Tender)
Within the tender period for the Thames Tideway Tunnel, I was put in charge
of supplying the whole team with initial CAD support and then either the
production or control of production from outside sources in the production of all drawing and graphic information used in our tender bid. This included
preparing and writing a project CAD manual, controlling standards in line with the requirements of the client, to supply all drawing and graphical data within in the project to be used within the BIM requirements to give at handover all
information for the asset management system. Unfortunately our time lost the
bid, as I was in line to be the project CAD and BIM manager for the duration of the project.
As for my role within the successful York Potash Tender, I was not only
managing the drawing side of the bid but also working with planning and logistics. This included site set ups within the tight boundaries of the shaft sites, from all elements from shaft sinking to TBM construction to TBM removal.
My role also lead me to locate and design the layout of a temporary workers
village to serve the project.
Within the tender period for the Thames Tideway Tunnel, I was put in charge
of supplying the whole team with initial CAD support and then either the
production or control of production from outside sources in the production of all drawing and graphic information used in our tender bid. This included
preparing and writing a project CAD manual, controlling standards in line with the requirements of the client, to supply all drawing and graphical data within in the project to be used within the BIM requirements to give at handover all
information for the asset management system. Unfortunately our time lost the
bid, as I was in line to be the project CAD and BIM manager for the duration of the project.
As for my role within the successful York Potash Tender, I was not only
managing the drawing side of the bid but also working with planning and logistics. This included site set ups within the tight boundaries of the shaft sites, from all elements from shaft sinking to TBM construction to TBM removal.
My role also lead me to locate and design the layout of a temporary workers
village to serve the project.
Design, Layout, Writing, CAD, Controlling, Asset Management, Management, Bim, Support, Production, Manager, ME
2014 - 2015
job
CAD Manager
Hochtief/Murphy Joint Venture.
(Thames Tideway Tunnel Tender & York Potash Material Handling Tunnels Tender)
Within the tender period for the Thames Tideway Tunnel, I was put in charge
of supplying the whole team with initial CAD support and then either the
production or control of production from outside sources in the production of all drawing and graphic information used in our tender bid. This included
preparing and writing a project CAD manual, controlling standards in line with the requirements of the client, to supply all drawing and graphical data within in the project to be used within the BIM requirements to give at handover all
information for the asset management system. Unfortunately our time lost the
bid, as I was in line to be the project CAD and BIM manager for the duration of the project.
As for my role within the successful York Potash Tender, I was not only
managing the drawing side of the bid but also working with planning and logistics. This included site set ups within the tight boundaries of the shaft sites, from all elements from shaft sinking to TBM construction to TBM removal.
My role also lead me to locate and design the layout of a temporary workers
village to serve the project.
Within the tender period for the Thames Tideway Tunnel, I was put in charge
of supplying the whole team with initial CAD support and then either the
production or control of production from outside sources in the production of all drawing and graphic information used in our tender bid. This included
preparing and writing a project CAD manual, controlling standards in line with the requirements of the client, to supply all drawing and graphical data within in the project to be used within the BIM requirements to give at handover all
information for the asset management system. Unfortunately our time lost the
bid, as I was in line to be the project CAD and BIM manager for the duration of the project.
As for my role within the successful York Potash Tender, I was not only
managing the drawing side of the bid but also working with planning and logistics. This included site set ups within the tight boundaries of the shaft sites, from all elements from shaft sinking to TBM construction to TBM removal.
My role also lead me to locate and design the layout of a temporary workers
village to serve the project.
Design, Layout, Writing, CAD, Controlling, Asset Management, Management, Bim, Support, Production, Manager, ME
2012 - 2014
job
Lead CAD Technician
JP Murphy & Sons.
(Crossrail C310 Project)
Lead CAD Technician/Draughtsman and project CAD representative.
Producing temporary and permanent works drawings, for all aspects of the
project. The project entails two running tunnels under the river Thames with
four Cross Passages, with Portal constructions at either end at Plumstead and North Woolwich. I would also produce all drawings for lifting plans and any
temporary road works.
Lead CAD Technician/Draughtsman and project CAD representative.
Producing temporary and permanent works drawings, for all aspects of the
project. The project entails two running tunnels under the river Thames with
four Cross Passages, with Portal constructions at either end at Plumstead and North Woolwich. I would also produce all drawings for lifting plans and any
temporary road works.
CAD, Portal
2012 - 2014
job
Lead CAD Technician
JP Murphy & Sons.
(Crossrail C310 Project)
Lead CAD Technician/Draughtsman and project CAD representative.
Producing temporary and permanent works drawings, for all aspects of the
project. The project entails two running tunnels under the river Thames with
four Cross Passages, with Portal constructions at either end at Plumstead and North Woolwich. I would also produce all drawings for lifting plans and any
temporary road works.
Lead CAD Technician/Draughtsman and project CAD representative.
Producing temporary and permanent works drawings, for all aspects of the
project. The project entails two running tunnels under the river Thames with
four Cross Passages, with Portal constructions at either end at Plumstead and North Woolwich. I would also produce all drawings for lifting plans and any
temporary road works.
CAD, Portal
2012 - 2012
temp
CAD Technician (Contract)
P C Harrington.
Producing as built drawings from raw survey data for a RC frame project in Woolwich.
CAD
2012 - 2012
temp
CAD Technician (Contract)
P C Harrington.
Producing as built drawings from raw survey data for a RC frame project in Woolwich.
CAD
2010 - 2011
temp
CAD Technician (Contract)
Halcrow Yolles.
Working on various concrete and steel frame projects at both tender and construction phases. Mixed development, residential, commercial and a hotel.
CAD, Development
2010 - 2011
temp
CAD Technician (Contract)
Halcrow Yolles.
Working on various concrete and steel frame projects at both tender and construction phases. Mixed development, residential, commercial and a hotel.
CAD, Development
2010 - 2010
temp
CAD Technician (Contract)
Rathborne and Roche.
Worked on the refurbishment of the Upper Forecourt at Gatwick Airport. A
mixed steel concrete project including RC detailing.
mixed steel concrete project including RC detailing.
CAD
2010 - 2010
temp
CAD Technician (Contract)
Rathborne and Roche.
Worked on the refurbishment of the Upper Forecourt at Gatwick Airport. A
mixed steel concrete project including RC detailing.
mixed steel concrete project including RC detailing.
CAD
2010 - 2010
temp
CAD Technician (Contract)
Walsh Associates.
Worked on the new, Birmingham Library project. A £193 million project, a
post tensioned concrete frame building, also including two steel frame
elements. A studio theatre and a book wall rotunda. The project also included an extension to the Reparatory Theatre which is of composite steel, concrete
construction.
crm/2
post tensioned concrete frame building, also including two steel frame
elements. A studio theatre and a book wall rotunda. The project also included an extension to the Reparatory Theatre which is of composite steel, concrete
construction.
crm/2
CRM, CAD
2010 - 2010
temp
CAD Technician (Contract)
Walsh Associates.
Worked on the new, Birmingham Library project. A £193 million project, a
post tensioned concrete frame building, also including two steel frame
elements. A studio theatre and a book wall rotunda. The project also included an extension to the Reparatory Theatre which is of composite steel, concrete
construction.
crm/2
post tensioned concrete frame building, also including two steel frame
elements. A studio theatre and a book wall rotunda. The project also included an extension to the Reparatory Theatre which is of composite steel, concrete
construction.
crm/2
CRM, CAD
2009 - 2009
temp
CAD Designer (Contract)
CMF Ltd.
Producing assembly, sub-assembly and part plan drawings for manufacture of stairs and balustrades etc.
CAD
2009 - 2009
temp
CAD Designer (Contract)
CMF Ltd.
Producing assembly, sub-assembly and part plan drawings for manufacture of stairs and balustrades etc.
CAD
2008 - 2008
temp
Structural AutoCAD Technician Bridges
MOTT MACDONALD GROUP.
(Contract)
Short Term Contract:
- Acting as lead CAD Technician on footway railway bridges. Duties where drawing up general
arrangements, sections and steelwork connection details taken from initial 3D drawn model, as
well as RC detailing of the foundations and detailing of cladding systems for the lift shafts.
Short Term Contract:
- Acting as lead CAD Technician on footway railway bridges. Duties where drawing up general
arrangements, sections and steelwork connection details taken from initial 3D drawn model, as
well as RC detailing of the foundations and detailing of cladding systems for the lift shafts.
Autocad, CAD, 3D, UP, Autocad
2008 - 2008
temp
Structural AutoCAD Technician Bridges
MOTT MACDONALD GROUP.
(Contract)
Short Term Contract:
- Acting as lead CAD Technician on footway railway bridges. Duties where drawing up general
arrangements, sections and steelwork connection details taken from initial 3D drawn model, as
well as RC detailing of the foundations and detailing of cladding systems for the lift shafts.
Short Term Contract:
- Acting as lead CAD Technician on footway railway bridges. Duties where drawing up general
arrangements, sections and steelwork connection details taken from initial 3D drawn model, as
well as RC detailing of the foundations and detailing of cladding systems for the lift shafts.
Autocad, CAD, 3D, UP, Autocad
2008 - 2008
temp
Structural AutoCAD Technician
Beattie Watkinson.
(Contract)
Projects included:
- Antelope House, Southampton as lead technician
A steel frame, commercial unit. Duties have included drawing up of all GA's, sections and details, including the reinforcement drawings for foundations & retaining wall. Co-
ordinating directly with a construction company, architects & steel frame fabricator
- Thornaby On Tees as lead technician
A project involving 6 separate commercial steel frame buildings. Duties as above
(Antelope House).
Projects included:
- Antelope House, Southampton as lead technician
A steel frame, commercial unit. Duties have included drawing up of all GA's, sections and details, including the reinforcement drawings for foundations & retaining wall. Co-
ordinating directly with a construction company, architects & steel frame fabricator
- Thornaby On Tees as lead technician
A project involving 6 separate commercial steel frame buildings. Duties as above
(Antelope House).
Autocad, UP, Autocad
2008 - 2008
temp
Structural AutoCAD Technician
Beattie Watkinson.
(Contract)
Projects included:
- Antelope House, Southampton as lead technician
A steel frame, commercial unit. Duties have included drawing up of all GA's, sections and details, including the reinforcement drawings for foundations & retaining wall. Co-
ordinating directly with a construction company, architects & steel frame fabricator
- Thornaby On Tees as lead technician
A project involving 6 separate commercial steel frame buildings. Duties as above
(Antelope House).
Projects included:
- Antelope House, Southampton as lead technician
A steel frame, commercial unit. Duties have included drawing up of all GA's, sections and details, including the reinforcement drawings for foundations & retaining wall. Co-
ordinating directly with a construction company, architects & steel frame fabricator
- Thornaby On Tees as lead technician
A project involving 6 separate commercial steel frame buildings. Duties as above
(Antelope House).
Autocad, UP, Autocad
2007 - 2008
temp
Structural AutoCAD Technician
BLYTH & BLYTH.
(Contract)
Produced general arrangements and details for multi storey building projects.
Project included:
- Iconix Phase 2 - Industrial steel framed building.
- Cambridge University Press - RC framed residential building
crm/3
Produced general arrangements and details for multi storey building projects.
Project included:
- Iconix Phase 2 - Industrial steel framed building.
- Cambridge University Press - RC framed residential building
crm/3
CRM, Autocad, Autocad
2007 - 2008
temp
Structural AutoCAD Technician
BLYTH & BLYTH.
(Contract)
Produced general arrangements and details for multi storey building projects.
Project included:
- Iconix Phase 2 - Industrial steel framed building.
- Cambridge University Press - RC framed residential building
crm/3
Produced general arrangements and details for multi storey building projects.
Project included:
- Iconix Phase 2 - Industrial steel framed building.
- Cambridge University Press - RC framed residential building
crm/3
CRM, Autocad, Autocad
2007 - 2007
temp
Structural AutoCAD Technician
WATERMAN GROUP.
(Contract)
Producing general arrangements and details for a mixture of new building and refurbishment building
projects.
Projects included:
- Bluewater - Steel frame
- New Holland Island (St Petersburg) - Leisure / Commercial
http://www.fosterandpartners.com/Projects/1426/Default.aspx
Four storey top down construction basement below existing Russian heritage owned
buildings. Refurbishment of existing buildings.
Producing general arrangements and details for a mixture of new building and refurbishment building
projects.
Projects included:
- Bluewater - Steel frame
- New Holland Island (St Petersburg) - Leisure / Commercial
http://www.fosterandpartners.com/Projects/1426/Default.aspx
Four storey top down construction basement below existing Russian heritage owned
buildings. Refurbishment of existing buildings.
Autocad, Russian, Http, Aspx, Autocad
2007 - 2007
temp
Structural AutoCAD Technician
WATERMAN GROUP.
(Contract)
Producing general arrangements and details for a mixture of new building and refurbishment building
projects.
Projects included:
- Bluewater - Steel frame
- New Holland Island (St Petersburg) - Leisure / Commercial
http://www.fosterandpartners.com/Projects/1426/Default.aspx
Four storey top down construction basement below existing Russian heritage owned
buildings. Refurbishment of existing buildings.
Producing general arrangements and details for a mixture of new building and refurbishment building
projects.
Projects included:
- Bluewater - Steel frame
- New Holland Island (St Petersburg) - Leisure / Commercial
http://www.fosterandpartners.com/Projects/1426/Default.aspx
Four storey top down construction basement below existing Russian heritage owned
buildings. Refurbishment of existing buildings.
Autocad, Russian, Http, Aspx, Autocad
2004 - 2007
job
Structural AutoCAD Technician (Permanent)
URS CORPORATION LTD.
Projects includes:
- Morganite Brickworks - 6 block Residential multi storey building.
- East India Dock - residential /commercial RC Framed building.
- New England Quarter (Brighton) RC framed residential commercial building project.
- Morganite Brickworks - 6 block Residential multi storey building.
- East India Dock - residential /commercial RC Framed building.
- New England Quarter (Brighton) RC framed residential commercial building project.
Autocad, Autocad
2004 - 2007
job
Structural AutoCAD Technician (Permanent)
URS CORPORATION LTD.
Projects includes:
- Morganite Brickworks - 6 block Residential multi storey building.
- East India Dock - residential /commercial RC Framed building.
- New England Quarter (Brighton) RC framed residential commercial building project.
- Morganite Brickworks - 6 block Residential multi storey building.
- East India Dock - residential /commercial RC Framed building.
- New England Quarter (Brighton) RC framed residential commercial building project.
Autocad, Autocad
2003 - 2004
job
Structural AutoCAD Technician (Permanent)
RICHARD JACKSON PLC.
Produced general arrangements and details drawings for multi-storey building projects.
Autocad, Autocad
2003 - 2004
job
Structural AutoCAD Technician (Permanent)
RICHARD JACKSON PLC.
Produced general arrangements and details drawings for multi-storey building projects.
Autocad, Autocad
2001 - 2003
job
Structural AutoCAD Technician (Permanent)
RLT ENGINEERING CONSULTANTS LTD.
Produced building general arrangements. Mostly concrete high rise residential buildings. Trench fill
foundation design to NHBC standards for traditional buildings.
foundation design to NHBC standards for traditional buildings.
Design, Autocad, Autocad
2001 - 2003
job
Structural AutoCAD Technician (Permanent)
RLT ENGINEERING CONSULTANTS LTD.
Produced building general arrangements. Mostly concrete high rise residential buildings. Trench fill
foundation design to NHBC standards for traditional buildings.
foundation design to NHBC standards for traditional buildings.
Design, Autocad, Autocad
1998 - 2001
job
Marine AutoCAD Technician/Drawing Office Manager
PORT OF FELIXSTOWE.
Produced general arrangements for marine and railway projects including operational feasibility options for new terminal and existing terminals. Land surveying of the terminal areas for civil maintenance
purposes. Setting up a new document management system with links to a GIS.
purposes. Setting up a new document management system with links to a GIS.
Autocad, Management, Gis, Office, Manager, UP, Autocad
1998 - 2001
job
Marine AutoCAD Technician/Drawing Office Manager
PORT OF FELIXSTOWE.
Produced general arrangements for marine and railway projects including operational feasibility options for new terminal and existing terminals. Land surveying of the terminal areas for civil maintenance
purposes. Setting up a new document management system with links to a GIS.
purposes. Setting up a new document management system with links to a GIS.
Autocad, Management, Gis, Office, Manager, UP, Autocad
1998 - 1998
temp
Civil & Structural AutoCAD Technician
ROBERT WEST CONSULTING.
(Contract)
Autocad, Autocad
1998 - 1998
temp
Civil & Structural AutoCAD Technician
ROBERT WEST CONSULTING.
(Contract)
Autocad, Autocad
1998 - 1998
temp
Electrical CAD Technician
ATLANTIC POWER.
(Contract)
Producing schematic electrical termination drawings and detailed control panel wiring layout general
arrangements.
Producing schematic electrical termination drawings and detailed control panel wiring layout general
arrangements.
Layout, CAD
1998 - 1998
temp
Electrical CAD Technician
ATLANTIC POWER.
(Contract)
Producing schematic electrical termination drawings and detailed control panel wiring layout general
arrangements.
Producing schematic electrical termination drawings and detailed control panel wiring layout general
arrangements.
Layout, CAD
1997 - 1998
temp
AutoCAD Technician
Norfolk County Council Highways Department.
(Contract)
crm/4
crm/4
CRM, Autocad, Autocad
1997 - 1998
temp
AutoCAD Technician
Norfolk County Council Highways Department.
(Contract)
crm/4
crm/4
CRM, Autocad, Autocad
My education
2006
-
2007
London South Bank University
HNC, Construction
HNC, Construction
Clive's reviews
Clive has not received any reviews on Worksome.
Contact Clive Monk
Worksome removes the expensive intermediaries and gives you direct contact with relevant talent.
Create a login and get the opportunity to write to Clive directly in Worksome.
38000+ qualified freelancers
are ready to help you
Tell us what you need help with
and get specific bids from skilled talent in Denmark