{{ $t($store.state.user.experience_value_in_dollars) }}
Expert
{{ $t($store.state.user.experience_search_name) }}
0
jobs
SENIOR PROJECT MANAGER
Alexander Barr
,
SOUTH SHIELDS, United Kingdom
Experience
Other titles
Skills
I'm offering
A highly effective Project Manager - Certified PM, Member of Association of Project Management (MAPM) and Chartered Engineer, with over 30 years' experience in a wide variety of Electro Mechanical environments. I retain a well balanced mix of both a traditional / site and academic professionally developed background. Proven experience both at senior managerial and at project level / site level in all aspects of the project life cycle and via a diverse range of high value-high profile projects. Established communication skills at all levels both internal and external to the organization with a proven track record of managing large project teams of multi-disciplined personal. I have spent the last 10 to 15 years as an M/E PM in the Energy industry primarily M/E substation delivery, culminating recently as the clients PM for larger value projects up to £12M around the UK - Local DNO's and NG. I am also experienced and can confidently work in mechanical and marine project environments as demonstrated below. Extensive experience of working independently both around the UK and overseas. Passionate and self motivated with strong leadership and analytical skills coupled with an ability to work well on own initiative. Equally capable of working in an operational role in the efficient achievement of multi project / programme objectives. Experienced in Risk management, Stakeholder Management and all associated applications of the Project Life Cycle to industry 'Best Practice' (BoK) standards.
Markets
United Kingdom
Language
English
Fluently
Ready for
Larger project
Ongoing relation / part-time
Full time contractor
Available
My experience
2018 - ?
job
Project Manager
Amey Power & Utilities.
Project Manager, Manager
2015 - 2018
freelance
Consultant / Clients Project Manager
Jacobs / WSP / PB Power.
I am embedded within Northern Power Grids organization as a consultant / client PM. Delivering Capex substation projects and new connections up to 132kV level in the North East and Yorkshire regions. E.g's - Ovenden Moor 22.MVA Windfarm in Halifax N Yorkshire. Harrogate Grid 132kV Reinforcement and Harrogate West 33kV New Substation. Also asset replacement programmes at various substations in same regions.
Project Manager, Embedded, Power, UP, Manager
2014 - 2015
job
Project Manager
Freedom Group.
Based at Boldon, Tyne and Wear. My duties include the PM of projects relating to; consultation, designing, building, installation, maintenance and replacement of assets on the UK Electrical 33kV / 132kV distribution networks. Mainly working with NPG on their DNO framework contract. Projects based in Northern Region of UK; 66kV /132kV - changeout of CB's, primary equipment, protection / control and civil scopes. Substations included; Toronto, Fossway, Coalburns, Maddison St, and Flatworth.
Project Manager, Framework, Manager
2013 - 2014
job
Project Manager
Deep Ocean.
26M Capex Project - PM for major vessel conversion of the 'Havila Phoenix' - "The ultimate sea trenching vessel". Duties involved the procurement, manufacture, installation, mobilisation and sea trials of the sea trenching and cable lay systems, including integration of shipyard scope associated with the class conversion / lengthening of vessel. I worked at many locations during this period including; Norway, Poland and Netherlands. https://www.youtube.com/watch?v=-0zEwJ2SY-o
Project Manager, Procurement, Integration, Youtube, Norway, Manager
2007 - 2013
job
Project Manager Renewables / T&D Projects
Siemens, Monkton Newcastle.
- Stublach Gas 132kV Gas Storage Project (Client - Jacobs, Value 7M),
15 month duration, building a substation connected to a Gas Storage facility in Cheshire on a Greenfield site. Multi-stakeholders involved and a compressed a timeline for the project. I achieved a "Zero" incident record across the project life-cycle and a commendation for my role was sent to Siemens Hierarchy. Included civil works, temporary works coordination and cross communication with an adjacent site controlled by a different client - SSE.
- Whitegate 132kV GIS Substation (Client - ENW, Value 17M),
16 Bay AIS substation based in Oldham Manchester. The existing substation was converted to a GIS and consisted of 5 remote ends around Manchester and also involved the safe demolition of the existing 10 acre site. National Grid commented in a CP feedback report that this was executed as a 'Model Project'.
- Greater Gabbard Offshore Windfarm, Siemens 1st offshore substation OSP (Client - Fluor, Value 110M (15M OSP)),
PM of the subcontractor for the 2200 tonne offshore substation at Hereema Hartlepool. The OSP connected to the Greater Gabbard Windfarm consisting of approx. 80 - 6MW turbines and the sister OSP Galloper. The power was transmitted to shore by 2 x 132kV export cables. Many obstacles were encountered in this first build and it was an extremely valuable lessons learnt exercise for the Siemens business.
- Newcastle 33kV Supply Electric Reinforcement (Client - NPG (CE), Value 12.5M),
A 66kV cable connection around the center of Newcastle connecting remote end locations. Involving civil works and external stakeholders associated with the Hadrian's Wall archeological site and the A1 motorway. I was the consortium PM for this project - Balfour Beatty, NPG and Siemens.
- Stonefoot Windfarm 66kV Connection (Client - NPG (CE), Value 3.5M),
Front end PM on a small wind farm connection in a remote location in county Durham also involving substation protection scope changes at other associated locations. Some minor civil works also involved.
Also during my time at Siemens I was also involved in business improvement initiatives particularly 'tailoring' of existing PM processes and procedures to align with industry best practice / APM approach. I was responsible for streamlining the processes in my department and was the process owner for the tasks associated with the DNO project life cycle. I followed the PM@Siemens career development plan and their rigorous assessment board - achieving Category 'C' PM status, recognized worldwide in the Siemens network.
15 month duration, building a substation connected to a Gas Storage facility in Cheshire on a Greenfield site. Multi-stakeholders involved and a compressed a timeline for the project. I achieved a "Zero" incident record across the project life-cycle and a commendation for my role was sent to Siemens Hierarchy. Included civil works, temporary works coordination and cross communication with an adjacent site controlled by a different client - SSE.
- Whitegate 132kV GIS Substation (Client - ENW, Value 17M),
16 Bay AIS substation based in Oldham Manchester. The existing substation was converted to a GIS and consisted of 5 remote ends around Manchester and also involved the safe demolition of the existing 10 acre site. National Grid commented in a CP feedback report that this was executed as a 'Model Project'.
- Greater Gabbard Offshore Windfarm, Siemens 1st offshore substation OSP (Client - Fluor, Value 110M (15M OSP)),
PM of the subcontractor for the 2200 tonne offshore substation at Hereema Hartlepool. The OSP connected to the Greater Gabbard Windfarm consisting of approx. 80 - 6MW turbines and the sister OSP Galloper. The power was transmitted to shore by 2 x 132kV export cables. Many obstacles were encountered in this first build and it was an extremely valuable lessons learnt exercise for the Siemens business.
- Newcastle 33kV Supply Electric Reinforcement (Client - NPG (CE), Value 12.5M),
A 66kV cable connection around the center of Newcastle connecting remote end locations. Involving civil works and external stakeholders associated with the Hadrian's Wall archeological site and the A1 motorway. I was the consortium PM for this project - Balfour Beatty, NPG and Siemens.
- Stonefoot Windfarm 66kV Connection (Client - NPG (CE), Value 3.5M),
Front end PM on a small wind farm connection in a remote location in county Durham also involving substation protection scope changes at other associated locations. Some minor civil works also involved.
Also during my time at Siemens I was also involved in business improvement initiatives particularly 'tailoring' of existing PM processes and procedures to align with industry best practice / APM approach. I was responsible for streamlining the processes in my department and was the process owner for the tasks associated with the DNO project life cycle. I followed the PM@Siemens career development plan and their rigorous assessment board - achieving Category 'C' PM status, recognized worldwide in the Siemens network.
Project Manager, C, SoMe, Gis, Network, Safe, It, Offshore, Development, Assessment, Storage, Power, Manager, Processes
2002 - 2007
job
Project Manager
Pearson Engineering Ltd.
Working as a PM, fully responsible for the project life cycle from tender, through production to delivery including onsite overseas training of client. Design and Production of mine clearing devices for the UK and Foreign MoD's (USA Marine Corps). Working on all major MoD UK / Overseas contracts in a high volume / high demand environment. Project managing contracts up to 8M in value, other duties included;
ITT negotiations, management of other departmental functions - engineering, hands-on
high volume production shop floor activities / management and after sales service activities. This included delivery and exporting activities to sensitive locations. My time also included site work viz. start up meetings, commissioning and onsite training for clients such as the Swedish Army and Chilean Army (Santiago 4 weeks).
ITT negotiations, management of other departmental functions - engineering, hands-on
high volume production shop floor activities / management and after sales service activities. This included delivery and exporting activities to sensitive locations. My time also included site work viz. start up meetings, commissioning and onsite training for clients such as the Swedish Army and Chilean Army (Santiago 4 weeks).
Design, Project Manager, Training, Contracts, Management, Sales, Service, Engineering, Production, USA, Contracts, UP, Manager
1994 - 2002
job
Project Manager
Rolls Royce Marine Service Dept.
Project Management (Sales and Service) of major contracts both in company and on site UK/overseas e.g.:- Turkey Croatia, Algeria, France, USA, Bermuda and all major UK Naval Shipyards (regularly Tyne). Customers Included blue chip organisations such as; BP, Mearsk, Ford, as well as the UK MoD.
- Providing logistical / technical support, directly interfacing with customer / subcontractors / suppliers and coordination of Labour / equipment / materials.
- All managerial aspects with respect; estimating, sales purchasing and preparing technical specifications for both the UK MoD and Commercial clients.
- Hands on site survey work onboard Naval and Commercial ships, of deck equipment, cranes and steering gear, coupled with troubleshooting visits to numerous locations (see above) at 'adhoc' short notice.
- A major portion of my work included managing multi-projects as a Programme associated with MoD RFA vessel refits (RAS activities) to strictly monitored timelines.
- Providing logistical / technical support, directly interfacing with customer / subcontractors / suppliers and coordination of Labour / equipment / materials.
- All managerial aspects with respect; estimating, sales purchasing and preparing technical specifications for both the UK MoD and Commercial clients.
- Hands on site survey work onboard Naval and Commercial ships, of deck equipment, cranes and steering gear, coupled with troubleshooting visits to numerous locations (see above) at 'adhoc' short notice.
- A major portion of my work included managing multi-projects as a Programme associated with MoD RFA vessel refits (RAS activities) to strictly monitored timelines.
Project Management, Project Manager, Contracts, Management, Sales, Service, Support, USA, Contracts, Manager
1990 - 1993
job
Undergraduate Engineer (Rolls Royce Marine)
University of Northumbria.
Sponsored by Rolls Royce I attended a full time degree course in Mechanical Engineering. During this time I worked all my college vacations to maintain continuity with the current contracts at the time. I completed a relevant work related project titled "Buckling Characteristics of Box Jib Cranes". This was a valuable contribution to the company throughout this period. Through this period I also followed the Rolls Royce Monitored Professional Development Scheme through to IMECHE Chartered Engineer Status.
Contracts, Engineering, Mechanical engineering, Development, Contracts
My education
University of Northumbria
Bachelors, Mechanical Engineering
Bachelors, Mechanical Engineering
Gateshead Technical College
Hndhncorequivalent, Mechanical and Production Engineering
Hndhncorequivalent, Mechanical and Production Engineering
n/a
Secondary, Engineering
Secondary, Engineering
Alexander's reviews
Alexander has not received any reviews on Worksome.
Contact Alexander Barr
Worksome removes the expensive intermediaries and gives you direct contact with relevant talent.
Create a login and get the opportunity to write to Alexander directly in Worksome.
38100+ qualified freelancers
are ready to help you
Tell us what you need help with
and get specific bids from skilled talent in Denmark