$$$$
{{ $t($store.state.user.experience_value_in_dollars) }}
Expert
{{ $t($store.state.user.experience_search_name) }}
0
jobs
Architect
Kiran M
,
Reading, United Kingdom
Experience
Other titles
Skills
I'm offering
Profile Summary: • 17+ Years of experience in IP/MPLS networks (LAN/WAN) and L2 network designing and Implementation • Experience in Designing the migrations and Leading implementation, upgrades and migration of customer services. • Experience in HLD, LLD, MoPs for Migrations. • Strong Understanding of SDN NFV architectures, MANO, Open Stack Frameworks ,Cloud technologies , AWS - EC2 , VPCs , VMware, Equinix Cloud Connect, Direct connect, Hosted Direct connections and Microsoft Azure and certified in Juniper cloud specialist • Experience in Cisco Routers & Switches, Juniper M320, M10i , Alcatel 7750,OS6850, Riverstone RS3000, RS8000,N15000 & Tellabs/Coriant platforms 8600, WWP LE46, LE311s, Palo Alto 5020 • Hands on Ixia, Spirent Adtech AX4000, Spirent Anue ,JDSU ANT 20 • Experience in MPLS, VPLS, IP Sec, L2 & L3 VPN technologies • Experienced as TDA/SME and Customer Technical Manager for major ISP's in Europe/UK • Lead the migration of from MPLS/ IP network to Metro Ethernet Network • Worked on IDS and Honey pot system • Worked on Hacking Tools like Trojans & Backdoors, Port scanning, Craft URL's, DoS attacks, DNS interrogation, Remote Access attacks, IP Spoofing etc. University & Degree information:
Markets
United Kingdom
Language
English
Fluently
Ready for
Larger project
Ongoing relation / part-time
Full time contractor
Available
My experience
2018 - ?
job
Transmission Design and Implementation Engineer
O2.
My role is to design the QoS on the Cell Site gateway (CSG) for different RAN technologies and make sure it aligns the BT IPVPN core solution. The QoS is specific for the CSGs connecting to Microwave sites where the BW capacities depends on the Modes the IDUs can operate.
Products & Technologies: ALU 7705, ALU7750, Juniper , MPLS, QoS,H QoS eBGP
GTT/ Interoute/ Easynet
Products & Technologies: ALU 7705, ALU7750, Juniper , MPLS, QoS,H QoS eBGP
GTT/ Interoute/ Easynet
Design, It, Implementation
2016 - 2018
job
TDA / Customer Technical Manager
Anglian Water /Accor group of Hotels/DVSA.
My role in Interoute being the Technical Design Authority/Customer technical Manager involved
- Being the customers advocate in all connectivity and communication technical
matters related to their solution
- Working with Customer Management and technical teams to provide Bespoke technical and
operational solutions as a SME
- Working hand in hand with Sales, looking to provide operational satisfaction to
the customer at acceptable margin while Sales manage the general commercial
- Taking the technical lead on delivery for large and/or complex customer solutions, coordinating the standard business areas as appropriate to hit program deliverables
- Trouble shooting any issue escalated by NOC and Tier 3 for the customers
Products: SD-WAN, Silver peak, AWS Direct connect, Equinix cloud connect, MS Azure Express route, Palo Alto, Juniper , MPLS, QoS
Daisy Networks
- Being the customers advocate in all connectivity and communication technical
matters related to their solution
- Working with Customer Management and technical teams to provide Bespoke technical and
operational solutions as a SME
- Working hand in hand with Sales, looking to provide operational satisfaction to
the customer at acceptable margin while Sales manage the general commercial
- Taking the technical lead on delivery for large and/or complex customer solutions, coordinating the standard business areas as appropriate to hit program deliverables
- Trouble shooting any issue escalated by NOC and Tier 3 for the customers
Products: SD-WAN, Silver peak, AWS Direct connect, Equinix cloud connect, MS Azure Express route, Palo Alto, Juniper , MPLS, QoS
Daisy Networks
Design, AWS, Azure, Cloud, Management, Sales, Express, WAN, Tech lead, Manager
2016 - 2017
job
Customer support Engineer (Tier 3)
Various Daisy Customers.
My role involved Leading, Planning and implementing the changes requested by the customer and also troubleshooting issues seen by customers.
- Planning the changes - liaising with the customer to find out the actual requirement and come out with a plan in adherence to Daisy Design architecture.
- Troubleshooting the issues raised by customer.
Products: Juniper Netscreen, cisco ASA, cisco 887.
Level 3 - Forced exit Project
- Planning the changes - liaising with the customer to find out the actual requirement and come out with a plan in adherence to Daisy Design architecture.
- Troubleshooting the issues raised by customer.
Products: Juniper Netscreen, cisco ASA, cisco 887.
Level 3 - Forced exit Project
Design, Cisco, Architecture, Support
2014 - 2016
freelance
Design Consultant/Migration Lead
Level 3 Communications, L.L.C.
My role involved Leading, Planning, Designing and Migration of around 1800+ live customer services from Global crossing PoP to Level3 PoP.
- Auditing IP services in Datacentre identified for exit, redising and replan the services for the new site
- Analyse Off -Net or On- Net Access tails to the Customer Ends. Assist the Access management team to order the right type of access circuits to at the target site
- Assist Order Management team to order new Access tails at the new Pop Site.
- Route the L3 VPN, L2 VPN and Internet services to appropriate PoPs based on the available Capacity.
- Actively involved in BOM for the new equipment, RFI , RFQ
- Developed HLD, LLD and CRL lists
- Migrations of Services to the new sites to facilitate the Global Crossing forced Exit.
Tellabs UK
- Auditing IP services in Datacentre identified for exit, redising and replan the services for the new site
- Analyse Off -Net or On- Net Access tails to the Customer Ends. Assist the Access management team to order the right type of access circuits to at the target site
- Assist Order Management team to order new Access tails at the new Pop Site.
- Route the L3 VPN, L2 VPN and Internet services to appropriate PoPs based on the available Capacity.
- Actively involved in BOM for the new equipment, RFI , RFQ
- Developed HLD, LLD and CRL lists
- Migrations of Services to the new sites to facilitate the Global Crossing forced Exit.
Tellabs UK
Design, Management, Net, Internet, Access management
2012 - 2014
job
Design Consultation /Migration Lead
Vodafone-UK.
My role is to provide professional services to VF-UK Design team and Lead the ATP to BEP migrations.
- Lead the migration team (multivendor) 20 Engineers local and remote. ATP network rings to IP enabled BEP network rings .The BEP network is based on Tellabs 8600 products - 8605, 8630 and 8660. The BEP network provides an IP/MPLS capability to Vodafone's Access Transmission.
- Lead and Design VF BEP1.0 DCN Optimization project (Phase B and Phase C implementation.)
- Professional service for VF-UK BEP1.0 Tellabs Upgrades
- Lead the migration team (multivendor) 20 Engineers local and remote. ATP network rings to IP enabled BEP network rings .The BEP network is based on Tellabs 8600 products - 8605, 8630 and 8660. The BEP network provides an IP/MPLS capability to Vodafone's Access Transmission.
- Lead and Design VF BEP1.0 DCN Optimization project (Phase B and Phase C implementation.)
- Professional service for VF-UK BEP1.0 Tellabs Upgrades
Design, C, Service, Network, Implementation
2010 - 2014
job
Network Consultation /Tech Support
British Telecommunications.
My role is to provide services to the Design team and the Integration test team for Tellabs devices in the BT Mobile Ethernet Access services (MEAS) environment and also see the ASKs depending on the requirement.
- Lead the live upgrades of the 150 Switch sites which are Tellabs 8660 nodes and were carrying services for BT's MEAS clients MBNL, Vodafone and O2 networks.
- Support to BT NIT team on SPIRs and other Technical issues with 8660,8605
- Validation of Tellabs upgrade and other rollout procedures and other design documents.
- Provide design solutions for BT Design requirement ASKs, test plans and MoPs
- Lead the BT MVCT testing from Tellabs end in interworking with CX600
- Lead the live upgrades of the 150 Switch sites which are Tellabs 8660 nodes and were carrying services for BT's MEAS clients MBNL, Vodafone and O2 networks.
- Support to BT NIT team on SPIRs and other Technical issues with 8660,8605
- Validation of Tellabs upgrade and other rollout procedures and other design documents.
- Provide design solutions for BT Design requirement ASKs, test plans and MoPs
- Lead the BT MVCT testing from Tellabs end in interworking with CX600
Design, Integration, Test, Network, Support, Testing
2009 - 2012
job
OAC solution Validation Engineer
Virgin Media.
A number of VM services are delivered over fiber access tails. Where circuits are off-net or fiber is unavailable, BT WES tails are used to connect to the customer sites. This service is provided over a dedicated point-to-point BT circuit between the two end points, typically a customer site and a VM PoP. The BT WES portfolio is to be replaced later in 2009 by the BT Ethernet Access Direct product.
The OAC design introduces savings by changing from a point-to-point to a hub and spoke topology. Traffic from multiple remote sites in the OLO network will be switched to an aggregate Gb interconnect at a Virgin Point of Presence. There will be eight interconnects with BT, five with C&W and one with COLT My role was to validate the design solution for the their offsite expansion
• Test the OAC circuits are working as expected on Both National Ethernet and Telewest products
• Report to senior management on client technical challenges and appropriate strategies for resolution.
• Validation of Designs, Proof of concepts and support the live deployments in the BT integration lab facility.
• Provide the documentation with procedures and caveats on the existing or the new solutions to the field engineers based on the results from internal testing or design changes validation..
The OAC design introduces savings by changing from a point-to-point to a hub and spoke topology. Traffic from multiple remote sites in the OLO network will be switched to an aggregate Gb interconnect at a Virgin Point of Presence. There will be eight interconnects with BT, five with C&W and one with COLT My role was to validate the design solution for the their offsite expansion
• Test the OAC circuits are working as expected on Both National Ethernet and Telewest products
• Report to senior management on client technical challenges and appropriate strategies for resolution.
• Validation of Designs, Proof of concepts and support the live deployments in the BT integration lab facility.
• Provide the documentation with procedures and caveats on the existing or the new solutions to the field engineers based on the results from internal testing or design changes validation..
Design, C, Management, Integration, Test, Service, Network, Net, Support, Testing
2008 - 2010
job
Solution Designer
British Telecom.
My role involves support and design validation for the TDMoE solutions over the Harmonised Ethernet running on MPLS backbone network provided by the BT to Vodafone and MBNL. The routing protocols used in the backhaul network are BGP, EBGP and OSPF. The CPE head ends and the base stations are terminated on the EEA which is Alcatel 7750 in their 21CN network.
• Analyze, troubleshoot, and manage projects to resolve a broad scope of technical challenges for BT's Mobile Ethernet solutions over the MPLS backbone network with BGP and OSPF routing.
• Report to senior management on client technical challenges and appropriate strategies for resolution.
• Validation of Designs, Proof of concepts and support the live deployments in the BT integration lab facility.
• Provide the documentation with procedures and caveats on the existing or the new solutions to the field engineers based on the results from internal testing or design changes validation..
• Support deployment team in managing the Deployment and health monitoring procedures using the EMS
• Analyze, troubleshoot, and manage projects to resolve a broad scope of technical challenges for BT's Mobile Ethernet solutions over the MPLS backbone network with BGP and OSPF routing.
• Report to senior management on client technical challenges and appropriate strategies for resolution.
• Validation of Designs, Proof of concepts and support the live deployments in the BT integration lab facility.
• Provide the documentation with procedures and caveats on the existing or the new solutions to the field engineers based on the results from internal testing or design changes validation..
• Support deployment team in managing the Deployment and health monitoring procedures using the EMS
Design, Deployment, Management, Integration, Network, Support, Monitoring, Testing, Health, Backbone, EMS
2006 - 2008
job
Software Engineer
Cisco Systems India Pvt. Ltd.
• Support migration team, designed the rollout of customer's classic IP network to MPLS network and porting their end users within planned network down time.
• My role is to validate the Designs and proof of concepts in the BT integration lab facility.
• Supported Deployment of a large-scale HSRP solution to improve the uptime of colocation customers, in the event a core router became unreachable.
• Designed a solution test bed for testing crypto IPSec VPNs, 802.1x Authentication, Access-lists based on customer scenario with Cisco 800, 2800
• Reproduction and fix verification of several critical customer network issues in the lab network.
• Analyze and baseline requirements for the new Cisco product line C1861, UC500, and IAD2435 & VG204.
• Developing a test plan for a new cisco features and product lines C18xx, IAD24xx,VG20x,UC500
• Automating the test plans, using the Tcl/TK Scripting languages and documentation
Riverstone Networks India Pvt. Ltd. (Now part of Alcatel Lucent)
• My role is to validate the Designs and proof of concepts in the BT integration lab facility.
• Supported Deployment of a large-scale HSRP solution to improve the uptime of colocation customers, in the event a core router became unreachable.
• Designed a solution test bed for testing crypto IPSec VPNs, 802.1x Authentication, Access-lists based on customer scenario with Cisco 800, 2800
• Reproduction and fix verification of several critical customer network issues in the lab network.
• Analyze and baseline requirements for the new Cisco product line C1861, UC500, and IAD2435 & VG204.
• Developing a test plan for a new cisco features and product lines C18xx, IAD24xx,VG20x,UC500
• Automating the test plans, using the Tcl/TK Scripting languages and documentation
Riverstone Networks India Pvt. Ltd. (Now part of Alcatel Lucent)
Cisco, Deployment, Scripting, Event, Integration, Test, Network, Support, Router, Testing, Software
2004 - 2006
job
Member technical Staff
unknown.
Role: Engineering Point of Contact for European Clients.
• Deploying Riverstone products in line with the design of the customers L2 VPN network. The two major customer network dealt is Telefonica and Telenor.
• Involved in deployment of Riverstone /Cisco products in the pilot network for performance/stress testing and providing the acceptable values for their networks operate with minimum down time.
• Handling issues and concerns noticed in the client site, provide appropriate solutions/workaround to minimize the downtime of the customer network.
• Worked on reproduction and fix verification of several critical customer network issues in the lab setup
• Coordinating the bug fixes with the release managers and upgraded the customer routers with the new releases in their site.
• Manual testing and test plan development for features like STP, Mac limiting, Protocol filtering, QoS etc.
• Involved in Automating the Test plans, using the Tcl/TK Scripting languages.
• Deploying Riverstone products in line with the design of the customers L2 VPN network. The two major customer network dealt is Telefonica and Telenor.
• Involved in deployment of Riverstone /Cisco products in the pilot network for performance/stress testing and providing the acceptable values for their networks operate with minimum down time.
• Handling issues and concerns noticed in the client site, provide appropriate solutions/workaround to minimize the downtime of the customer network.
• Worked on reproduction and fix verification of several critical customer network issues in the lab setup
• Coordinating the bug fixes with the release managers and upgraded the customer routers with the new releases in their site.
• Manual testing and test plan development for features like STP, Mac limiting, Protocol filtering, QoS etc.
• Involved in Automating the Test plans, using the Tcl/TK Scripting languages.
Design, Cisco, Deployment, Scripting, Manual testing, Mac, Test, Network, Engineering, Testing, Development, STP
2002 - 2004
job
Senior software Engineer
Wipro Technologies Limited.
Role: Network Engineer
Implemented a regional backbone network with multiple high-speed points of presence for a regional Internet service provider. Reviewed and tested routers and switches. Configured Cisco routers to create a redundant, reliable network infrastructure using BGPand OSPF routing protocols. Negotiated and established peering with upstream tier-1 ISPs. Resolved network problems related to equipment failures, configuration problems, and denial-of-service (DoS/DDoS) attacks.
Peak XV Networks Pvt Limited.
Implemented a regional backbone network with multiple high-speed points of presence for a regional Internet service provider. Reviewed and tested routers and switches. Configured Cisco routers to create a redundant, reliable network infrastructure using BGPand OSPF routing protocols. Negotiated and established peering with upstream tier-1 ISPs. Resolved network problems related to equipment failures, configuration problems, and denial-of-service (DoS/DDoS) attacks.
Peak XV Networks Pvt Limited.
Cisco, Service, Network, Infrastructure, Software, Internet, Backbone
2000 - 2002
job
Junior Network Engineer
unknown.
• Designed and implemented in-house IDS manhunt and Honey pot mantrap Built secure management networks for remote data centers using IPSec tunnels. Installation of the IDS on the sun Solaris servers designed the network to form a rap for the hacker recording the activities of the hacker in the honey pot system.Analyse the logs if they are not tampered and the hash matches the Ibutton hashes.
• Assisted the redesigning of production network infrastructures to improve reliability and manageability and migrated static routing to BGP and OSPF.
• Assisted the redesigning of production network infrastructures to improve reliability and manageability and migrated static routing to BGP and OSPF.
Management, Network, Production
My education
The National Institute of Engineering Mysore University
Bachelors, Computer Science
Bachelors, Computer Science
The Manipal Academy of Higher Education
MBA, N/a
MBA, N/a
Kiran's reviews
Kiran has not received any reviews on Worksome.
Contact Kiran M
Worksome removes the expensive intermediaries and gives you direct contact with relevant talent.
Create a login and get the opportunity to write to Kiran directly in Worksome.
38000+ qualified freelancers
are ready to help you
Tell us what you need help with
and get specific bids from skilled talent in Denmark