A motivated construction professional, with a proven track record for the successful delivery & completion of commercial, retail, educational & fit out projects. Originally from a carpentry & joinery background with strong leadership and operational skills. With the formation of Retail & Leisure Ltd in 1995, whilst achieving stable & profitable growth in the retail and leisure sectors of the industry. Delivering multiple flagship store and successful rollout programs for clients such as Monsoon, New Look, T Mobile, Toys R Us and Timberland. Retail and Leisure enjoyed continued success for ten years and had an annual turnover in excess of 3.8 million. In August 2006 Retail & Leisure Ltd was sold to and amalgamated into Integral UK Ltd and I became National Operations manager. I was directly responsible for the, M.O.D, Barclays and First Great Western Accounts.
Markets
United Kingdom
Language
English
Fluently
Ready for
Available
My experience
2019 - 2019
temp
Current Contract
Bed Apartments. Coates House Nailsea.
Value: £ 4.9million
Position Project Manager
Contractor H W Pollards & Sons Bridgewater.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to maximize efficiency for the completion of 56 one & two bed apartments.
-To implement all working programs for contractors including critical path objectives to maximize works over 3 floors.
- To hold and co-ordinate daily site meetings with site management team, including sub-contractor's managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the nominated sub-contractors to ensure that all their expectations of the principal contractor where exceeded.
- To identify contractor's & packages that were a risk item to the successful delivery of the project.
Previous Contract:
Project: Deanery Secondary School Swindon
Position Project Manager
Contractor H W Pollards & Sons Bridgewater.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to maximize efficiency for the completion of 56 one & two bed apartments.
-To implement all working programs for contractors including critical path objectives to maximize works over 3 floors.
- To hold and co-ordinate daily site meetings with site management team, including sub-contractor's managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the nominated sub-contractors to ensure that all their expectations of the principal contractor where exceeded.
- To identify contractor's & packages that were a risk item to the successful delivery of the project.
Previous Contract:
Project: Deanery Secondary School Swindon
Project Manager, Management, Health, Safety, Manager
2018 - 2019
job
Senior site Manager / Completion Manager
unknown.
Contractor BAM Western
Roles and Responsibilities
- To implement key program activities & objectives with the Project team.
-To implement all working programs for contractors including critical path objectives to maximize works over 3 floors whilst minimizing disruption to the adjoining
- To hold and co-ordinate daily site meetings with site management team, including sub-contractor's managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the nominated sub-contractors to ensure that all their expectations of the principal contractor where exceeded.
- To identify contractor's packages that were a risk item to the successful delivery of the project.
Roles and Responsibilities
- To implement key program activities & objectives with the Project team.
-To implement all working programs for contractors including critical path objectives to maximize works over 3 floors whilst minimizing disruption to the adjoining
- To hold and co-ordinate daily site meetings with site management team, including sub-contractor's managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the nominated sub-contractors to ensure that all their expectations of the principal contractor where exceeded.
- To identify contractor's packages that were a risk item to the successful delivery of the project.
Management, Health, Safety, Site manager, Manager
2017 - 2018
job
Project Manager
Bed Care home (assisted living).
Worcester.
Project: New Build specialist care facility.
Dates: Sept 2017-Nov 2018.
Value: £ 2.4 million
Position Project Manager.
Contractor Lancer Scott Construction (Bristol)
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the site whilst reporting to the contract's director.
-To implement all working programs for contractors including critical path objectives to maximize works over 2 floors whilst minimizing disruption to the local residents & neighboring school.
- To hold and co-ordinate daily site meetings with site management team, including sub-contractor's managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were adhered too.
- To identify contractor's packages that were a risk to the successful delivery of the project.
Project: New Build specialist care facility.
Dates: Sept 2017-Nov 2018.
Value: £ 2.4 million
Position Project Manager.
Contractor Lancer Scott Construction (Bristol)
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the site whilst reporting to the contract's director.
-To implement all working programs for contractors including critical path objectives to maximize works over 2 floors whilst minimizing disruption to the local residents & neighboring school.
- To hold and co-ordinate daily site meetings with site management team, including sub-contractor's managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were adhered too.
- To identify contractor's packages that were a risk to the successful delivery of the project.
Project Manager, Management, Health, Safety, Manager
2017 - 2017
job
Project Manager
Royal High School Bath.
Project: Dorm refurbishment 96 bedrooms
Dates: June2017-sept 2017
Value: £ 1.3 million
Position Project Manager.
Contractor Beard Construction (Swindon)
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the school whilst reporting to the contracts director.
-To implement all working programs for contractors including critical path objectives to maximize works over four floors whilst minimizing disruption to the school during term time.
- To hold and co-ordinate daily site meetings with site management team, including sub-contractor's managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the nominated sub-contractors to ensure that all their expectations of the principal contractor where exceeded.
- To identify contractor's packages that were a risk item to the successful delivery of the project.
Dates: June2017-sept 2017
Value: £ 1.3 million
Position Project Manager.
Contractor Beard Construction (Swindon)
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the school whilst reporting to the contracts director.
-To implement all working programs for contractors including critical path objectives to maximize works over four floors whilst minimizing disruption to the school during term time.
- To hold and co-ordinate daily site meetings with site management team, including sub-contractor's managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the nominated sub-contractors to ensure that all their expectations of the principal contractor where exceeded.
- To identify contractor's packages that were a risk item to the successful delivery of the project.
Project Manager, Contracts, Management, Health, Safety, Contracts, Manager
2016 - 2017
job
Project Manager
MAC Interiors.
Project: Cat A commercial Fit out Cathedral Sq Bristol.
Dates: Oct 2016-June2017
Value: £ 8.6 million
Position Project Manager.
Contractor MAC Interiors (Dublin)
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the contracts director..
-To implement all working programs for contractors including critical path objectives to maximize works over four floors whilst minimizing disruption to the adjoining Hilton Hotel.
- To hold and co-ordinate daily site meetings with site management team, including sub contractors managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the nominated sub contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Dates: Oct 2016-June2017
Value: £ 8.6 million
Position Project Manager.
Contractor MAC Interiors (Dublin)
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the contracts director..
-To implement all working programs for contractors including critical path objectives to maximize works over four floors whilst minimizing disruption to the adjoining Hilton Hotel.
- To hold and co-ordinate daily site meetings with site management team, including sub contractors managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the nominated sub contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Contracts, Management, Mac, Health, Safety, Contracts, Manager
2015 - 2016
temp
Current Contract
Dolphin School (Colston girls school group).
Value: £ 6.0 million
Position Senior Site Manager.
Contractor BAM Construction.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the school during term times.
-To implement all working programs for contractors including critical path objectives to maximize works in non term times.
- To hold and co-ordinate daily site meetings with the on site management team, including section refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the school head master and nominated contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Previous Contract: Tesco Stores mezzanine floor extension and refurbishment
Position Senior Site Manager.
Contractor BAM Construction.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the school during term times.
-To implement all working programs for contractors including critical path objectives to maximize works in non term times.
- To hold and co-ordinate daily site meetings with the on site management team, including section refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the school head master and nominated contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Previous Contract: Tesco Stores mezzanine floor extension and refurbishment
Management, Health, Safety, Site manager, Manager
2015 - 2015
freelance
Project Manager
unknown.
Contractor Uplands Retail.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the live store.
-To manage the delivery schedule of all deliveries for all contractors as not to impact on the store.
-To implement all working programs for contractors including critical path objectives.
-To communicate the phased changes to the fire escape plan with both store partners and contractors.
-To oversee all retail areas from construction to completion.
- To hold and co-ordinate daily site meetings with the on site management team, including store refit managers, Architects, Project surveyors, Site managers and specialist contractors.
-To produce achievable short term detailed project programs and to issue to & report on Sub contractors progress.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Store SDM and nominated contractors to ensure that all their expectations of the contractor and the build package where exceeded.
Previous Contract: Asda Acquisitions Pyle Bridgend.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the live store.
-To manage the delivery schedule of all deliveries for all contractors as not to impact on the store.
-To implement all working programs for contractors including critical path objectives.
-To communicate the phased changes to the fire escape plan with both store partners and contractors.
-To oversee all retail areas from construction to completion.
- To hold and co-ordinate daily site meetings with the on site management team, including store refit managers, Architects, Project surveyors, Site managers and specialist contractors.
-To produce achievable short term detailed project programs and to issue to & report on Sub contractors progress.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Store SDM and nominated contractors to ensure that all their expectations of the contractor and the build package where exceeded.
Previous Contract: Asda Acquisitions Pyle Bridgend.
Retail, Management, Health, Safety, Manager
2015 - 2015
freelance
Project Manager
ISG Construction.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the Lob centre & pharmacy units during opening times.
-To implement all working programs for contractors including critical path objectives to maximize works in non term times.
- To hold and co-ordinate daily site meetings with the on site management team, including section refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To oversee the removal of asbestos roofs and ACM's within the building whilst maintain program.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Clients PM and nominated contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Previous Contract: Gallagher Retail Park Cheltenham. Refurbishment of ten vacant and Live stores
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the Lob centre & pharmacy units during opening times.
-To implement all working programs for contractors including critical path objectives to maximize works in non term times.
- To hold and co-ordinate daily site meetings with the on site management team, including section refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To oversee the removal of asbestos roofs and ACM's within the building whilst maintain program.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Clients PM and nominated contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Previous Contract: Gallagher Retail Park Cheltenham. Refurbishment of ten vacant and Live stores
Project Manager, Retail, Management, Health, Safety, Manager
2014 - 2015
freelance
Project Manager
Longcross Construction.
Contractor Longcross Construction
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the store during opening times.
-To implement all working programs for contractors including critical path objectives to maximize works.
- To hold and co-ordinate daily site meetings with the on site management team, including section refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Clients PM and nominated contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the store during opening times.
-To implement all working programs for contractors including critical path objectives to maximize works.
- To hold and co-ordinate daily site meetings with the on site management team, including section refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Clients PM and nominated contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Management, Health, Safety, Manager
2012 - 2013
job
Senior Site Manager
Bristol Free School.
Contractor BAM Construction.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the school during term times.
-To implement all working programs for contractors including critical path objectives to maximize works in non term times.
- To hold and co-ordinate daily site meetings with the on site management team, including section refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the school head master and nominated contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Previous Contract: Waitrose store re-development Bath.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the school during term times.
-To implement all working programs for contractors including critical path objectives to maximize works in non term times.
- To hold and co-ordinate daily site meetings with the on site management team, including section refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the school head master and nominated contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Previous Contract: Waitrose store re-development Bath.
Management, Development, Health, Safety, Site manager, Manager
2012 - 2012
freelance
Senior Site Manager
unknown.
Contractor R G Carter (Builders)
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the live store.
-To manage the delivery schedule of all deliveries for all contractors as not to impact on the store(or the Hilton Hotel above)
-To implement all working programs for contractors including critical path objectives.
-To communicate the phased changes to the fire escape plan with both store partners and contractors.
-To oversee all retail areas from construction to completion.
- To hold and co-ordinate daily site meetings with the on site management team, including store refit managers, Architects, Project surveyors, Site managers and specialist contractors.
-To produce achievable short term detailed project programs and to issue to & report on Sub contractors progress.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Store SDM and nominated contractors to ensure that all their expectations of the contractor and the build package where exceeded.
Previous Contract: Marks & Spencer Refurbishment Gloucester
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the live store.
-To manage the delivery schedule of all deliveries for all contractors as not to impact on the store(or the Hilton Hotel above)
-To implement all working programs for contractors including critical path objectives.
-To communicate the phased changes to the fire escape plan with both store partners and contractors.
-To oversee all retail areas from construction to completion.
- To hold and co-ordinate daily site meetings with the on site management team, including store refit managers, Architects, Project surveyors, Site managers and specialist contractors.
-To produce achievable short term detailed project programs and to issue to & report on Sub contractors progress.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Store SDM and nominated contractors to ensure that all their expectations of the contractor and the build package where exceeded.
Previous Contract: Marks & Spencer Refurbishment Gloucester
Retail, R, Management, Health, Safety, Manager
2012 - 2012
freelance
Senior Site Manager
Ellmer Try Joint Venture.
Contractor Ellmer Try Joint Venture.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the store.
-To implement all working programs for contractors including critical path objectives.
-To oversee all retail areas from construction to completion.
- To hold and co-ordinate daily site meetings with the on site management team, including store refit managers, Architects, Project surveyors, Site managers and specialist contractors.
-To produce achievable short term detailed project programs and to issue to & report on Sub contractors progress.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Store SDM and nominated contractors to ensure that all their expectations of the contractor and the build package where exceeded.
- To indentify contractors packages that were a risk item to the success delivery of the project.
Previous Contract: Newbury Parkway
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the store.
-To implement all working programs for contractors including critical path objectives.
-To oversee all retail areas from construction to completion.
- To hold and co-ordinate daily site meetings with the on site management team, including store refit managers, Architects, Project surveyors, Site managers and specialist contractors.
-To produce achievable short term detailed project programs and to issue to & report on Sub contractors progress.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Store SDM and nominated contractors to ensure that all their expectations of the contractor and the build package where exceeded.
- To indentify contractors packages that were a risk item to the success delivery of the project.
Previous Contract: Newbury Parkway
Retail, Management, Health, Safety, Manager
2012 - 2012
freelance
Section Manager
Costain Construction.
Contractor Costain Construction.
Roles and Responsibilities
- To hold and co-ordinate daily site meetings with the on site management team, including store refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Store SDM and nominated contractors to ensure that all their expectations of the contractor and the build package where exceeded.
- To indentify contractors packages that were a risk item to the success delivery of the project.
Roles and Responsibilities
- To hold and co-ordinate daily site meetings with the on site management team, including store refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Store SDM and nominated contractors to ensure that all their expectations of the contractor and the build package where exceeded.
- To indentify contractors packages that were a risk item to the success delivery of the project.
Management, Health, Safety, Manager
2011 - 2011
job
Project Manager
New Sibland School.
Contractor Interserve
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the school during term times.
-To implement all working programs for contractors including critical path objectives to maximize works in non term times.
- To hold and co-ordinate daily site meetings with the on site management team, including section refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the school head master and nominated contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Previous Contract. Tesco stores refresh program Aylesbury, Minehead, Eastville , Evesham Slough & Faversham.
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the school during term times.
-To implement all working programs for contractors including critical path objectives to maximize works in non term times.
- To hold and co-ordinate daily site meetings with the on site management team, including section refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the school head master and nominated contractors to ensure that all their expectations of the principal contractor where exceeded.
- To indentify contractors packages that were a risk item to the successful delivery of the project.
Previous Contract. Tesco stores refresh program Aylesbury, Minehead, Eastville , Evesham Slough & Faversham.
Project Manager, Management, Health, Safety, Manager
2009 - 2011
freelance
Site based project Manager
unknown.
Contractor ISG Pearce
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the store.
-To implement all working programs for contractors including critical path objectives.
- To hold and co-ordinate daily site meetings with the on site management team, including store refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Store SDM and nominated contractors to ensure that all their expectations of the contractor and the build package where exceeded.
- To indentify contractors packages that were a risk item to the success delivery of the project.
Previous Contract. Tesco stores refresh program London & Poole
Roles and Responsibilities
- To liaise on a daily basis with the Project team and all nominated contractors to minimize disruption to the store.
-To implement all working programs for contractors including critical path objectives.
- To hold and co-ordinate daily site meetings with the on site management team, including store refit managers, Architects, Project surveyors, Site managers and specialist contractors.
- To ensure all Health and safety requirements were enforced.
- To have weekly co-ordination meetings with the Store SDM and nominated contractors to ensure that all their expectations of the contractor and the build package where exceeded.
- To indentify contractors packages that were a risk item to the success delivery of the project.
Previous Contract. Tesco stores refresh program London & Poole
Project Manager, Management, Health, Safety, Manager
2009 - 2009
freelance
Site/ Night Manager
unknown.
Contractor ISG Pearce/ISG Cathedral
Roles and Responsibilities: ABD
Previous Contract. Temple Quay Bristol
Roles and Responsibilities: ABD
Previous Contract. Temple Quay Bristol
Manager
2009 - 2009
freelance
Section/ Site- Finishing Manager
unknown.
Contractor Balfour Beatty
Roles and Responsibilities: ABD
Previous Contract. Writhlington School Radstock
Value: 25 Million
Position Senior site Manager
Contractor Kier Western
Roles and Responsibilities: ABD
Contract. The Paragon Building, Bristol
Value: 28 Million
Position Assistant Project Manager
Contractor LeadBitter (Southwest).
Roles and Responsibilities: ABD
Contract. BBC Audio Books Bath
Value: 435K
Position Project Manager
Contractor Interaction Associates Bath.
Rolls and Responsibilities: ABD
Contract: Asda store refurbishment and extension.
Value: 2 Million.
Position: Assistant Project Manager.
Contractor: Uplands Construction (Bristol).
Date: August 2008 Duration eight weeks.
Roles and Responsibilities.- ABD.
Roles and Responsibilities: ABD
Previous Contract. Writhlington School Radstock
Value: 25 Million
Position Senior site Manager
Contractor Kier Western
Roles and Responsibilities: ABD
Contract. The Paragon Building, Bristol
Value: 28 Million
Position Assistant Project Manager
Contractor LeadBitter (Southwest).
Roles and Responsibilities: ABD
Contract. BBC Audio Books Bath
Value: 435K
Position Project Manager
Contractor Interaction Associates Bath.
Rolls and Responsibilities: ABD
Contract: Asda store refurbishment and extension.
Value: 2 Million.
Position: Assistant Project Manager.
Contractor: Uplands Construction (Bristol).
Date: August 2008 Duration eight weeks.
Roles and Responsibilities.- ABD.
Project Manager, Audio, Site manager, Manager
2008 - 2008
freelance
Senior Project/Site manager
Canada life Basingstoke.
Contractor: Interaction Associates Bath.
Date: March 2008 - Aug 2008
Contract: Tesco store extension. New Milton.
Value: 450k
Date: March 2008 - Aug 2008
Contract: Tesco store extension. New Milton.
Value: 450k
Site manager, Manager
2008 - 2008
freelance
Project manager (Nights)
Pearce Group.
Contract: First great western and Barclays Bank account manager
Value: Up to 25million (multiple sites) over 2.5 years
Value: Up to 25million (multiple sites) over 2.5 years
Project Manager, Account Manager, UP, Manager
2005 - 2008
freelance
National Operations Manager
unknown.
First Great Western Account Manager Roles & Responsibilities.
- To liaise with both FGW and Architect at the planning stage to agree work phasing, to minimize disruption to station operations and the public. To implement the design and construction phase Health and Safety Plans.
- To compile detailed works programs, on Microsoft project incorporating critical path objectives and safe working practices for the public, station staff and contractors. Long and short term detailed programs.
- To agree all payment valuations with the PQS and subcontractors alike.
- To ensure all Health and Safety guidelines were being meet for the public, staff and contractors alike.
- To supply and agree costs for all extras and unforeseen works.
- To arrange delivery dates and installation programs for automated ticket machines and barriers.
- To oversee the Setting up of temporary facilities for staff, public and contractors, including temporary ticket halls and kiosks.
- To check and agree that subcontractors completed works to the FGW specification.
- To attend all station programming meetings on a weekly basis, and design/ cost meetings on a fortnightly basis.
- To oversee the team of site based managers on a daily basis.
- To attend daily ten minute "Huddle" meetings with senior station staff to discuss all station/contractor issues.
Projects Completed for First Great Western.
- Ealing Broadway. - Major station upgrade works to ticket halls and public areas including waiting rooms and toilets.
- Oxford Station.- major station upgrade to ticket halls, platforms, waiting rooms
- Reading Station. - Major station upgrade works, platform and waiting rooms completed with DDA compliant lifts and WC's. (Ticket Hall works Postponed).
- Taunton Station. - Major ticket hall and platform waiting areas, with DDA lifts WC's.
- Queens Waiting Room. (Paddington) Project Postponed.
Projects completed for Barclays Bank.
- To liaise with both FGW and Architect at the planning stage to agree work phasing, to minimize disruption to station operations and the public. To implement the design and construction phase Health and Safety Plans.
- To compile detailed works programs, on Microsoft project incorporating critical path objectives and safe working practices for the public, station staff and contractors. Long and short term detailed programs.
- To agree all payment valuations with the PQS and subcontractors alike.
- To ensure all Health and Safety guidelines were being meet for the public, staff and contractors alike.
- To supply and agree costs for all extras and unforeseen works.
- To arrange delivery dates and installation programs for automated ticket machines and barriers.
- To oversee the Setting up of temporary facilities for staff, public and contractors, including temporary ticket halls and kiosks.
- To check and agree that subcontractors completed works to the FGW specification.
- To attend all station programming meetings on a weekly basis, and design/ cost meetings on a fortnightly basis.
- To oversee the team of site based managers on a daily basis.
- To attend daily ten minute "Huddle" meetings with senior station staff to discuss all station/contractor issues.
Projects Completed for First Great Western.
- Ealing Broadway. - Major station upgrade works to ticket halls and public areas including waiting rooms and toilets.
- Oxford Station.- major station upgrade to ticket halls, platforms, waiting rooms
- Reading Station. - Major station upgrade works, platform and waiting rooms completed with DDA compliant lifts and WC's. (Ticket Hall works Postponed).
- Taunton Station. - Major ticket hall and platform waiting areas, with DDA lifts WC's.
- Queens Waiting Room. (Paddington) Project Postponed.
Projects completed for Barclays Bank.
Design, Operations, Account Manager, Operations manager, Microsoft Project, Safe, Health, Safety, UP, Manager
2005 - 2008
freelance
Contracts / Account Manager
Market Town Upgrades.
Contractor: Integral Interiors Ltd.
Date: 2005 - 2008
Barclays Account Manager Rolls & Responsibilities.
- To meet with the Barclays representative on site ,and to agree the works package required.
- To formulate the works package and specification into a bill of quantities with an agreed schedule of rates foe funding approval.
- To liaise with Branch managers and Barclays facilities team to agree works program.
- To liaise with planning and council officials foe consent and heritage approval were required.
- To generally oversee all projects from concept to completion
- To prepare accounts and finical reports with QS and agree final accounts with clients representative.
Contract: T Mobile multiple sites up to ten at one time, mainland UK
Value: Various at £30-100K each store.
Date: 2005 - 2008
Barclays Account Manager Rolls & Responsibilities.
- To meet with the Barclays representative on site ,and to agree the works package required.
- To formulate the works package and specification into a bill of quantities with an agreed schedule of rates foe funding approval.
- To liaise with Branch managers and Barclays facilities team to agree works program.
- To liaise with planning and council officials foe consent and heritage approval were required.
- To generally oversee all projects from concept to completion
- To prepare accounts and finical reports with QS and agree final accounts with clients representative.
Contract: T Mobile multiple sites up to ten at one time, mainland UK
Value: Various at £30-100K each store.
Contracts, Account Manager, Contracts, UP, Manager
2005 - 2005
freelance
Contracts Director
Retail Leisure Ltd.
Contracts, Contracts
1996 - 2005
freelance
Contacts Director
Toys "R".
US various stores and head office fit out, repeat business.
Value: £50k - 275k depending on store upgrade.
Position: Contacts Director.
Contractor: Retail & Leisure Ltd.
Date: 1996 -2005.
Value: £50k - 275k depending on store upgrade.
Position: Contacts Director.
Contractor: Retail & Leisure Ltd.
Date: 1996 -2005.
Retail, Office
My education
City AND Guilds Advanced Carpentry AND Joinery
Hndhncorequivalent, Const procedures and site management
Hndhncorequivalent, Const procedures and site management
Adam's reviews
Adam has not received any reviews on Worksome.
Contact Adam Summerfield
Worksome removes the expensive intermediaries and gives you direct contact with relevant talent.
Create a login and get the opportunity to write to Adam directly in Worksome.
38000+ qualified freelancers
are ready to help you
Tell us what you need help with
and get specific bids from skilled talent in Denmark