A competent and enthusiastic Civil Engineer with a detailed knowledge of full project lifecycle from inception to close out. Quick to grasp new ideas, able to develop innovative solutions to problems solving, and can demonstrate a high level of motivation required to meet deadlines. I have an experience that span over 10 years in Building, Infrastructure, Civil, Oil and Gas sectors with a proven track record of successful project delivery to required standard and specifications. Able to integrate the diverse construction experience in the planning, scheduling, tracking, monitoring and controlling process that will ensure completion of projects within the boundaries of project goals (scope, time, cost, and safety). Additionally, possess the skills required to conduct critical path analysis, reporting, estimating, control cost, risk identification with a view to further develop myself in planning career. A vibrant team player who is always committed to delivering exceptional rather than expected results in line with Best Practices guidelines.
Markets
United Kingdom
Language
English
Fluently
Ready for
My experience
2019 - ?
job
Project Engineer
World Mission Agency.
• Manage the robust design and construction programme in the delivery of reconstruction and refurbishment of derelict property into the multi-purpose hall using P6.
• Identification and management of scope and constraints to the successful completion of the project.
• Identification, production and documentation of the project deliverables including programmes, progress reporting and presentations.
• Ensuring that the programme content is consistent with the planning procedures and standard.
• The programme issued to all stakeholders for comments, review, and implementation of recommendations.
• The issuance and communication of approved and baselined Contract Programme (CP) to the Project Manager (PM) for transmission to Client and Project Team (PT).
• Manage scope changes, submitted RFIs, generation of cost and schedule estimates (CSEs).
• Interface with subcontractors to discuss the impact of issues on the deliverables and the resolution.
• Spearhead and direct project planning control and monitoring efforts.
• Provide regular update to the programme.
• Monitoring of the construction programme and reporting any variance to the PT.
• EVM tools are used to analyse the performance of time and cost schedules.
• Preparation of the report for cash flow and manpower utilisation using S-curves and Histogram.
• Identification and management of scope and constraints to the successful completion of the project.
• Identification, production and documentation of the project deliverables including programmes, progress reporting and presentations.
• Ensuring that the programme content is consistent with the planning procedures and standard.
• The programme issued to all stakeholders for comments, review, and implementation of recommendations.
• The issuance and communication of approved and baselined Contract Programme (CP) to the Project Manager (PM) for transmission to Client and Project Team (PT).
• Manage scope changes, submitted RFIs, generation of cost and schedule estimates (CSEs).
• Interface with subcontractors to discuss the impact of issues on the deliverables and the resolution.
• Spearhead and direct project planning control and monitoring efforts.
• Provide regular update to the programme.
• Monitoring of the construction programme and reporting any variance to the PT.
• EVM tools are used to analyse the performance of time and cost schedules.
• Preparation of the report for cash flow and manpower utilisation using S-curves and Histogram.
Design, Project Manager, Content, Management, Implementation, Monitoring, Production, Manager
2018 - 2018
job
Senior Site Engineer
Worcestershire Royal Hospital.
• Supported Project Manager in day-day management of site activities in the refurbishment scheme.
• Responsible for short term planning using P6.
• Checked construction drawings and raised technical queries (RFIs) with the design team
• Resolved technical, constructability, quality issue and liaised with consultants on compliance issues.
• Ensured that QHSE policies were strictly adhered to on site among the construction team.
• Liaised and reviewed any scope change with the construction team.
• Communicated any risk identified with such changes to the PM.
• Prepared and managed 2 weeks look ahead programme using the Last Planner.
• Managed and coordinated the construction team to achieve deliverables within the key dates and milestones
• Reported actual performance against schedules including risks/opportunities to key milestones periodically.
• Led a team of Site Engineers, coordinated the information flow and checked quality of work.
• Coordinated the requirement needs of the engineering team and ensured they are always met.
• Reviewed and approved Subcontractor's RAMS documents.
• Spearheaded subcontractors' weekly progress review meetings.
• Responsible for short term planning using P6.
• Checked construction drawings and raised technical queries (RFIs) with the design team
• Resolved technical, constructability, quality issue and liaised with consultants on compliance issues.
• Ensured that QHSE policies were strictly adhered to on site among the construction team.
• Liaised and reviewed any scope change with the construction team.
• Communicated any risk identified with such changes to the PM.
• Prepared and managed 2 weeks look ahead programme using the Last Planner.
• Managed and coordinated the construction team to achieve deliverables within the key dates and milestones
• Reported actual performance against schedules including risks/opportunities to key milestones periodically.
• Led a team of Site Engineers, coordinated the information flow and checked quality of work.
• Coordinated the requirement needs of the engineering team and ensured they are always met.
• Reviewed and approved Subcontractor's RAMS documents.
• Spearheaded subcontractors' weekly progress review meetings.
Design, Project Manager, Management, Engineering, Compliance, QHSE, Manager, LED
2018 - 2018
job
Construction Planner
IP Central Panel Work.
Plain Line Track Renewals and the Electrification Programme for London North Eastern and East Midlands £5m
Main Tech Ltd (Colas Rail)
Construction Planner
• Managed and controlled project deliverables in rail infrastructures refurbishment projects.
• Planned, arranged, scheduled and monitored work activities as well as interfacing with the design team.
• Created weekly progress, work forecast and cost control audits report.
• Identified critical activities and resource requirements for the project delivery and made adequate planning prior to commencement of work on site.
• Planned resources and monitored materials tracking schedule
• Implemented all change request to deliverables upon receipt of instruction.
• Supported EVM by providing accurate and timely project data required for performance measurement.
• Conducted site briefing, inductions, toolbox talks and ensuring compliance with site safety procedures.
• Maintained an accurate record of daily site activities and comparing these to target programmes.
• Provided suggestion and relevant data from project execution to support Planning and Scheduling processes.
• Regular meeting attendance with the Commercial and Risk Team to discuss risk/issues arising from the project delivery and ways to mitigate them.
• Prepared short to long period look ahead programme to enable the tracking of the project.
Main Tech Ltd (Colas Rail)
Construction Planner
• Managed and controlled project deliverables in rail infrastructures refurbishment projects.
• Planned, arranged, scheduled and monitored work activities as well as interfacing with the design team.
• Created weekly progress, work forecast and cost control audits report.
• Identified critical activities and resource requirements for the project delivery and made adequate planning prior to commencement of work on site.
• Planned resources and monitored materials tracking schedule
• Implemented all change request to deliverables upon receipt of instruction.
• Supported EVM by providing accurate and timely project data required for performance measurement.
• Conducted site briefing, inductions, toolbox talks and ensuring compliance with site safety procedures.
• Maintained an accurate record of daily site activities and comparing these to target programmes.
• Provided suggestion and relevant data from project execution to support Planning and Scheduling processes.
• Regular meeting attendance with the Commercial and Risk Team to discuss risk/issues arising from the project delivery and ways to mitigate them.
• Prepared short to long period look ahead programme to enable the tracking of the project.
Design, Compliance, Support, Safety, Forecast, Processes
2015 - 2017
job
Senior Site Engineer
Jewellery Quarters.
(£80m)
Colmore Tang Construction
Senior Site Engineer
• Implemented the setting out, survey and all aspect of technical responsibilities on the above residential schemes.
• Managed materials take-off and requisition and ensured timely delivery to site in line with construction programme.
• Efficiently planned and managed construction activities to ensure the deliverables meet the required timelines and budgets.
• Liaised regularly with the Project Manager to discuss progress and issues that may affect the project and suggest solutions.
• Identified design errors and raised technical queries (RFIs) with the consultant.
• Maintained an excellent working relationship with the design and project team including other work colleagues.
• Managed and controlled site diary, accident book and drawing register.
• Mentored 1 Graduate Engineer.
• Discovered a major design error that could have resulted in slippage and a monumental loss of money (£200K), advised the Design Manager on the corrective measures to adopt and implemented them.
• Participated in progress meetings fortnightly and updated the Project Team about the Project Status.
• Managed and monitored various work packages and supervised subcontractors.
• Ensured optimal utilisation of resources and minimise waste.
• Collaborated with the procurement department to ensure resources available on site to complete tasks.
• Monitored and Reviewed the key performance indicators (KPIs) with respect to schedule and cost.
Colmore Tang Construction
Senior Site Engineer
• Implemented the setting out, survey and all aspect of technical responsibilities on the above residential schemes.
• Managed materials take-off and requisition and ensured timely delivery to site in line with construction programme.
• Efficiently planned and managed construction activities to ensure the deliverables meet the required timelines and budgets.
• Liaised regularly with the Project Manager to discuss progress and issues that may affect the project and suggest solutions.
• Identified design errors and raised technical queries (RFIs) with the consultant.
• Maintained an excellent working relationship with the design and project team including other work colleagues.
• Managed and controlled site diary, accident book and drawing register.
• Mentored 1 Graduate Engineer.
• Discovered a major design error that could have resulted in slippage and a monumental loss of money (£200K), advised the Design Manager on the corrective measures to adopt and implemented them.
• Participated in progress meetings fortnightly and updated the Project Team about the Project Status.
• Managed and monitored various work packages and supervised subcontractors.
• Ensured optimal utilisation of resources and minimise waste.
• Collaborated with the procurement department to ensure resources available on site to complete tasks.
• Monitored and Reviewed the key performance indicators (KPIs) with respect to schedule and cost.
Design, Project Manager, Procurement, Manager
2014 - 2015
job
Site Engineer
Cannock Retail Park.
• Managed the setting out, levelling, surveying operations.
• Planned the Steel frame, Brickwork, Drainages, Timber frame, Metsec and effectively managed the site.
• Spearheaded the efficient management of a team of 2 engineers, 2 foremen, and 5 labourers.
• Efficiently organised the plant, resources and planned the work to meet the agreed deadlines.
• Ensured that materials used, and the activities completed are as per the contract specifications.
• Read and checked the plans, drawings and BOQ for accuracy of calculations.
• Developed a mini programme using MSP for the project and populated a risk register.
• Planned the Steel frame, Brickwork, Drainages, Timber frame, Metsec and effectively managed the site.
• Spearheaded the efficient management of a team of 2 engineers, 2 foremen, and 5 labourers.
• Efficiently organised the plant, resources and planned the work to meet the agreed deadlines.
• Ensured that materials used, and the activities completed are as per the contract specifications.
• Read and checked the plans, drawings and BOQ for accuracy of calculations.
• Developed a mini programme using MSP for the project and populated a risk register.
Management, Calculations, MSP
2013 - 2014
job
Site Engineer
Berry-Fields.
• Managed the pre-commencement engineering survey, dimensional controls, setting out, and collation of as-built records as per company's procedures on Bridge/Road project.
• Worked collaboratively with the design team, construction team and interfaced with the subcontractors to ensure that work progresses as per the programme.
• Helped the Planning Engineer to develop a database of activities duration and productivity rate for construction work.
• Tried my hands on the use of P6 software to develop a programme for the project under the guidance of the Project Planner.
• Checked plans, drawings and quantities for accuracy of calculation and design.
• Ordered materials and ensured that they are used as per specifications and delivered to site in a timely manner.
• Oversaw the quality control by ensuring work is delivered within acceptable tolerance and ensured safety procedures were complied with by workforce.
• Worked collaboratively with the design team, construction team and interfaced with the subcontractors to ensure that work progresses as per the programme.
• Helped the Planning Engineer to develop a database of activities duration and productivity rate for construction work.
• Tried my hands on the use of P6 software to develop a programme for the project under the guidance of the Project Planner.
• Checked plans, drawings and quantities for accuracy of calculation and design.
• Ordered materials and ensured that they are used as per specifications and delivered to site in a timely manner.
• Oversaw the quality control by ensuring work is delivered within acceptable tolerance and ensured safety procedures were complied with by workforce.
Design, Database, Engineering, Software, Safety
2013 - 2013
internship
Construction Manager
AMEC.
(Intern)
• Worked with supply chain and project control during this period and conversant with AMEC integrated Engineering and Business Management Suite (3D collaborative platform).
• Participated in safety, constructability and progress review meetings.
• Collaborated with Supply Chain Manager to track the delivery reports of the status of the activities.
• Reconciled supply and delivery order by tracking the procurement status report (PSR) and material receiving report (MRR).
• Ensured cost details, change order, delivery dates information for the purchase order for every sub-contract were checked before passing them to the project control.
Between August 2012 and June 2013, started an academic programme to obtain a master's degree in construction management at the University of Birmingham, hence stopped work during this period.
Key Projects Completed
• Worked with supply chain and project control during this period and conversant with AMEC integrated Engineering and Business Management Suite (3D collaborative platform).
• Participated in safety, constructability and progress review meetings.
• Collaborated with Supply Chain Manager to track the delivery reports of the status of the activities.
• Reconciled supply and delivery order by tracking the procurement status report (PSR) and material receiving report (MRR).
• Ensured cost details, change order, delivery dates information for the purchase order for every sub-contract were checked before passing them to the project control.
Between August 2012 and June 2013, started an academic programme to obtain a master's degree in construction management at the University of Birmingham, hence stopped work during this period.
Key Projects Completed
Management, Procurement, 3D, Engineering, Business Management, Safety, Manager, Internal
2007 - 2012
job
Site Engineer on the following Projects
unknown.
• Birmingham District Energy Scheme (Cofely)
• £150M North East Quadrant (NEQ) mixed development for British Land (Lend Lease).
• DLR 3-car enhancement (DLR Stations platform extension) for Taylor Woodrow and East London Extension Line, and Track Renewal at Haggerston, and Hoxton stations (Mansell Rail) project towards 2012 Olympic.
• £275M Walbrook scheme, Canon Street, city of London (Skanska).
• Kerrin Point Infrastructure and Mixed development, Kennington (Barratt Homes).
• £76M Turnkey package for the construction of Sentrum 3 Data Centre, Watford (Mercury Engineering).
Prior to October 2007, performed the technical, organisational and supervisory role as a Project Engineer/Planner on several projects across Nigeria.
• £150M North East Quadrant (NEQ) mixed development for British Land (Lend Lease).
• DLR 3-car enhancement (DLR Stations platform extension) for Taylor Woodrow and East London Extension Line, and Track Renewal at Haggerston, and Hoxton stations (Mansell Rail) project towards 2012 Olympic.
• £275M Walbrook scheme, Canon Street, city of London (Skanska).
• Kerrin Point Infrastructure and Mixed development, Kennington (Barratt Homes).
• £76M Turnkey package for the construction of Sentrum 3 Data Centre, Watford (Mercury Engineering).
Prior to October 2007, performed the technical, organisational and supervisory role as a Project Engineer/Planner on several projects across Nigeria.
Engineering, Development, Infrastructure, Energy, Energy
Bukola's reviews
Bukola has not received any reviews on Worksome.
Contact Bukola Afolabi
Worksome removes the expensive intermediaries and gives you direct contact with relevant talent.
Create a login and get the opportunity to write to Bukola directly in Worksome.
38100+ qualified freelancers
are ready to help you
Tell us what you need help with
and get specific bids from skilled talent in Denmark